CHAT WITH US

01684 567 183

FOLLOW US

Timber Frame Lime Render Restoration – Colwall

Back to our work

We were instructed to carry out specialist lime rendering and restoration works to this timber-framed property in Colwall near Malvern. Previous cement-based render and metal mesh had deteriorated, creating issues with the wall’s ability to breathe and manage moisture effectively.

After carefully removing the unsuitable materials, we installed loose wood fibre insulation within the wall void before constructing new timber studwork to support a woodwool carrier board. The property was then prepared using a traditional lime putty scratch coat reinforced with natural hair, creating a breathable base for the lime render system.

This approach helps improve thermal performance while maintaining the breathability required for traditional and historic buildings.

crosschevron-down