Removal of a failed render system and carrier boards at Costa Coffee in Hardwicke, followed by installation of a new silicone render system.
After stripping back to a sound substrate, we rebuilt the system correctly to achieve a flat, clean finish designed for long-term performance. A commercial re-render carried out with proper preparation, compliant materials, and attention to detail throughout.